During product development, companies need to determine their product’s readiness for release. This process takes place after you have spent time learning your market’s problems, building a solution and testing the product, it’s time to determine whether that product is ready for release.
Many companies mistakenly equate being ready to release a product with being ready to launch. However, there is a difference between the two:
During the development process, as your team tests the product, they will find defects (also known as bugs). Use an online tracking tool to track these defects to encourage a streamlined approach to managing and resolving them. Rank each defect according to its severity, ranging from “showstopper” to “low-level/cosmetic.”
The following are sample defect definitions; adjust them as necessary for your organization:
While it is preferable to release the product with no bugs, this happens rarely. A reasonable guide is to ship with no showstopper or high-level bugs, and minimal medium-level bugs.
During the testing process, negotiate with the engineering team to determine how many of each type of bug you and your customers would tolerate if you were to release.
Your team should be able to outline at regular intervals how many of each type of bug currently exist. While your goal is to ship with no bugs, this could negatively affect your release date and thus your revenue projections.
As the product manager, review the outstanding bug list on a regular basis with the testing team. Review the status of each open (unresolved) bug, and understand the scenarios through which these bugs were identified.
If you identify High-level bugs that must be fixed, you can choose to delay the release date. In the case of low-level/cosmetic bugs, you might choose to address them during a future release.
Example: You have the following bug list:
In this scenario, you might decide that unreadable characters populating the country field is an acceptable bug because the user can easily delete them. However, you accept you do not want to alarm the user with an error message upon accessing the address book.
Similar to when you prioritized your product requirements, place bugs in priority order and make trade-offs where necessary.
After using either the Waterfall or Agile methodology to develop your product requirements, your product development is considered complete.
To that end, you then need to freeze the environment (called “code freeze” in IT). This means that no further development should take place unless it involves fixing a bug that is discovered during testing and deemed necessary to fix.
Your engineers must respect this concept; otherwise, unexpected changes can be introduced into the product, adding unnecessary risk to the project.
Once bug triage is complete and your team has finished fixing the defects, the product is considered “live.”
This means that you have reached the final version of the product, and it is ready for distribution or manufacturing (whichever your product requires). The live product is expected to be very stable, relatively bug-free and ready for customer consumption.
Once you have a live product and you reach the scheduled release date (“live date”), the product launch can begin. For more information, read the following articles: